Extensive Renovation of Victorian Home 

Taking over 18 months, this Victorian home in Tockwith was brought up to date whilst remaining sympathetic to period features. The work included a two storey extension, orangery and remodelling of the existing space. Work was carried out in most parts of the house and every trade involved - groundworkers, bricklayers, roofing, joinery, plumbing, heating, electric, steelwork etc. 
 
The works created a much larger kitchen and utility room, brand new sitting & dining area in the orangery and master bedroom suite on the first floor. The staircase was partially refurbished and some sections entirely replaced. One of the dormers was replaced and replacement windows throughout the house featured accoya frames and more energy efficient glazing. Bathrooms were refurbished and the front and side doors replaced, matching the previous style. 
 
Click here for photos of the completed work 
Original House
Demolition of utility room & boiler house
Existing house stripped right back
Construction of steelwork & external walls for new kitchen, dining & utility room
Roofing works
Roof & guttering complete over master bedroom.  Utility room being constructed.  Steelwork awaiting glazing for orangerie.
Progress in the Orangery
Progress in the Orangery
Progress with the front porch
External completion of porch
Top of new staircase
Looking down through new staircase
Orangerie tiled & decorated. 2nd fix electrics in progress
Kitchen Installation
Installation of sanitary ware
Kitchen through to orangerie
Orangerie almost complete
Bathroom completed
Driveway works complete
Carport
Orangerie awaiting finishing touches